|
Reservoir Engineering
• Added 10 MMBBLS proved reserves at $1.80/bbl in three months by developing a plan for a 10 section waterflood and convincing a reserve company to book the reserves as proved.
• Performed and managed many reservoir simulation studies to optimize drilling locations and waterflood performance.
• Proficient and pragmatic reservoir engineer who can quickly determine the most profitable course of action.
|